NOTICE OF NOMINATIONS
NOMINATIONS FOR THE FOLLOWING ZONES FOR SHOP STEWARDS WILL BE HELD ON
TUESDAY, JUNE 2, 2026, WENDSDAY JUNE 3, 2026, AND THURSDAY JUNE 4, 2026
AT THE UNION HALL 1000 E FOURTH ST EDDYSTONE, PA 19022 BETWEEN THE HOURS OF 8:00AM TO 4:00PM.
(TIMES AND LOCATIONS TO BE POSTED AFTER NOMINATIONS ARE HELD)
ELECTIONS WILL BE HELD THE WEEK OF JUNE 15TH TO THE 19TH
Zone #1 – Third Shift Northside and Southside All Departments
Zone #2 – Second Shift Southside All Departments
Zone #3 – Second Shift Northside All Departments
Zone #4 – First Shift Northside building 3-25 All Departments (maintenance, Tube Shop All 3-25 loading dock, Janitors & Boiler Operators)
Zone #5 – First Shift Northside All 3-12 All 3-31 (except APF) whirl tower and Wind Tunnel
Zone #6 – First Shift Northside Building 3-07 and 3-06 All Department including all Inspection and Material support
Zone #8– First Shift Southside Building 3-61 All F line H-47, Engine, and Pod Shop, plus inspection Peddle Box Final Assembly, plus inspection Mechanical Sub plus all inspection All F-line H-47 inspection, All EMD line plus inspection.
Zone #10 – First Shift Building 3-57 3511, 3515, 3516, 3517, 3985, 3981, 3569, 3486, 3493, 3568, 3575, 3566, 3567, 3572, 3573 Buildings 3-57 All CCRAM material support, All V-22 Material Support, All CCRAM and -22 inspection, All 3-60 Material Support, All H-47 and V22 Paint, Rain Test, H-47 pod shop buildup (building 3-57), Lot Time, Peddle Box Assembly, Building 3-57 3510 (hub shop), 3571, 3479, 3557, 3576, 3579, 3598, 3580, 3570, 3585, 3586, 3577, 3578, 3581, 3584, 3582, 3574, 3583, 3487, 3488, 3489, 3490, 3491, 3588, ,H47 cockpit, Forward Pylon buildup
Zone #11 – First Shift Southside Building All Delivery Center, H-47, CCRAM, MH139 shops including inspection and locksmith 3462 pre-flight, Delivery Center Material support, 3-62 Pre Flight / Pylon Shop.
Zone # 14 – First Shift Building 3-60 H-47 Structures, Cabin Section, Transmission buildup, All Aft Section shops, All H-47 Structure inspection (building 3- 57 and 3-60), and Engine Fairing, Pylon shop and Engine cowling and ramp.
Zone # 15 – First Shift Building 3-61 All Alt line and Alt line Inspection, All Material support in 3-61
Zone #50 – First Shift Northside Building 3-25, 3-31 Department 7L50, APF
UAW Local 1069
1000 E. 4th Street
Eddystone, PA 19022-1517
view map
Phone: (610) 876-6217
E-Mail: local1069.uaw@gmail.com
Visit our Contact Us page.
Hours of Operation
Mon-Thur. 7:30 to 3:30
Friday 5:00 to 1:30

